Client: T Clarke
Royal Bournemouth Hospital BEACH and Link Building
Project Brief:
The Supply and Install of Ductwork to a new Hospital Building
Services Provided:
The manufacture and installation of general supply and extract systems to the following:
- Fire Rated Ductwork using in house Firemac System
- Manufacture of Bespoke Linear Plenums
Value: £2.5 million over a 22 Month programme
Client: Skanska
Zurich Office Project Norwood (Swindon)
Services Provided:
The manufacture and installation of external supply and extract ductwork from the Air Handling Units located on the roof to serve the Office floor areas. The Floor Areas consisted of Flat Oval primary ductwork through VAV units and supplying Fan Coil Units.
Value: £1,000,000.00 over a 7-Month programme
Client: Wates Construction
University of Portsmouth Ravelin Sports Centre
Project Brief:
The Supply and Install of Ductwork to a new Leisure Centre in Portsmouth
Services Provided:
The manufacture and installation of general supply and extract systems to the following:
- Pool Extract and Supply Ducts Painted Internally and Externally to designated Environmental Zones
- Wet Change Supply and Extract Painted Internally and Externally to designated Environmental Zones
- Dry Change, WC, Squash Courts, Studios and various standard areas
- Plastic UPVC Ductwork
Value: £530,000 over a 8-Month programme
Client: Wates Construction
Farnborough Exhibition Centre
Project Brief:
The Supply and Install of Ductwork Internally/Externally and Installation of Air Socks and Free Issue Plant Items
Services Provided:
The manufacture and installation of large external supply and extract ductwork from the Air Handling Units located on the roof to serve the Free Issue Air Socks which were located in the Halls, Foyers and Function Rooms and installed by Industrial Ventilation Products Ltd. Also within the project Industrial Ventilation Products installed Galvanised and Fire Rated ductwork to the Kitchens/Serveries, W Cs and general areas.
Value: £527,000 over a 6-Month Programme
Client: Skanska
Project Wellesley:
Project Brief:
The Supply and Install of Ductwork to four Main Buildings B101,102,103 and 106.
Industrial Ventilation Products works were carried out in the four building’s simultaneously to meet the programme requirements.
Services Provided:
The manufacture and installation of general supply and extract systems, toilet extract ductwork and fixing free issue items
General supply and extract systems were installed throughout the floors.
The main plant consisted of various Air handling units and extract fans installed on the roof levels.
Value: £740,000 over a 12-Month programme
Client: Interserve Engineering Services
Fleming Park Leisure Centre:
Project Brief:
The Supply and Install of Ductwork to a new Leisure Centre Building in Eastleigh
Services Provided:
The manufacture and installation of general supply and extract systems to the following:
- Pool Extract and Supply Ducts Painted Internally and Externally where exposed
- Wet Change Supply and Extract Painted Internally and Externally where exposed
- Dry Change, WC, Squash Courts, Studios and various standard areas
- Powder Coated Flat Oval in Exposed area in the Fitness Studios exposed to view
With the addition to the above there was a requirement for parts of the Pool Area Extract ductwork to be Fire Rated in the Risers which the Firemac application was applied.
The main plant consisted of various Air handling units and extract fans installed on the roof levels.
Value: £370,000 over a 8-Month programme
Other Recent Projects are as Follows:
- Various– Assets at the Bulford, Tidworth and Larkhill Army Bases ranging from £17k to £150k